IS WORK OVER?

Automation index

How much of a Cobbler’s job can AI already do?

A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cobbler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnose, sole and the quote.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Stitch, stick and the heel that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Last, the fit and the one that pinches.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Colour, cream and the pair that does not match.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the dance and not cutting the vamp.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not come off, and not leaving a lame heel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stitch soles
  • stick heels
  • lasts
  • creams
  • vamp
  • shoe fit
  • pairs
  • cobbler quotes

Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 546Valet19%
  2. 547Glassblower19%
  3. 548Stained-glass artist19%
  4. 550Dog trainer18%
  5. 551Forest ranger18%
  6. 552Aerial technician18%