Automation index
How much of a Cobbler’s job can AI already do?
A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cobbler
19%
AI can already do 19% of this job.
#559 / 643
View rankingCobbler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, sole and the quote.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, stick and the heel that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Last, the fit and the one that pinches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Colour, cream and the pair that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the dance and not cutting the vamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not come off, and not leaving a lame heel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stitch soles
- stick heels
- lasts
- creams
- vamp
- shoe fit
- pairs
- cobbler quotes
Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536
IS WORK OVER?
Nuclear engineer
24%
#272 / 643
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149