IS WORK OVER?

Automation index

How much of a Cobbler’s job can AI already do?

A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cobbler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnose, sole and the quote.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Stitch, stick and the heel that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Last, the fit and the one that pinches.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Colour, cream and the pair that does not match.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the dance and not cutting the vamp.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not come off, and not leaving a lame heel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stitch soles
  • stick heels
  • lasts
  • creams
  • vamp
  • shoe fit
  • pairs
  • cobbler quotes

Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 656Glassblower19%
  2. 657Stained-glass artist19%
  3. 658Red Cross volunteer19%
  4. 660Dog trainer18%
  5. 661Forest ranger18%
  6. 662Aerial technician18%