Automation index
How much of a Cobbler’s job can AI already do?
A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cobbler
19%
AI can already do 19% of this job.
#669 / 753
View rankingCobbler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, sole and the quote.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, stick and the heel that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Last, the fit and the one that pinches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Colour, cream and the pair that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the dance and not cutting the vamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not come off, and not leaving a lame heel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stitch soles
- stick heels
- lasts
- creams
- vamp
- shoe fit
- pairs
- cobbler quotes
Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142