Automation index
How much of a Colourist’s job can AI already do?
A look comes earlier. Skin that holds without eating the set do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Colourist
27%
AI can already do 27% of this job.
#141 / 623
View rankingColourist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Look, stills and the reference.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Session, nodes and the hard shot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Skin, sky and not eating the set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Delivery, HDR and the one that misses in the theatre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The director, the ego and not loading the orange.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Skin holds, and the look does not lie.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- looks
- nodes
- skin
- HDR
- stills
- the colour bay
- hard shots
- look references
Sources for this job· O*NET 27-4032.00· ESCO/ISCO 3521
IS WORK OVER?
Energy engineer
27%
#160 / 623
View rankingEnergy engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Energy audit, curves and the saving potential.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Contracts, tariffs and the power market.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Plant, meters and what the meter misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Efficiency projects and the real payback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The board, the CAPEX and the no to the project.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Save for real, and not selling green smoke.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- energy audit
- load curves
- power tariffs
- energy efficiency
- CAPEX payback
- plant metering
- power market
- real savings
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149