Automation index
How much of a Colourist’s job can AI already do?
A look comes earlier. Skin that holds without eating the set do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Colourist
27%
AI can already do 27% of this job.
#146 / 733
View rankingColourist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Look, stills and the reference.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Session, nodes and the hard shot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Skin, sky and not eating the set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Delivery, HDR and the one that misses in the theatre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The director, the ego and not loading the orange.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Skin holds, and the look does not lie.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- looks
- nodes
- skin
- HDR
- stills
- the colour bay
- hard shots
- look references
Sources for this job· O*NET 27-4032.00· ESCO/ISCO 3521
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142