Automation index
How much of a Colourist’s job can AI already do?
A look comes earlier. Skin that holds without eating the set do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Colourist
27%
AI can already do 27% of this job.
#141 / 633
View rankingColourist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Look, stills and the reference.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Session, nodes and the hard shot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Skin, sky and not eating the set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Delivery, HDR and the one that misses in the theatre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The director, the ego and not loading the orange.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Skin holds, and the look does not lie.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- looks
- nodes
- skin
- HDR
- stills
- the colour bay
- hard shots
- look references
Sources for this job· O*NET 27-4032.00· ESCO/ISCO 3521
IS WORK OVER?
Mason
15%
#617 / 633
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112