Automation index
How much of a Colourist’s job can AI already do?
A look comes earlier. Skin that holds without eating the set do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Colourist
27%
AI can already do 27% of this job.
#141 / 623
View rankingColourist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Look, stills and the reference.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Session, nodes and the hard shot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Skin, sky and not eating the set.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Delivery, HDR and the one that misses in the theatre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The director, the ego and not loading the orange.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Skin holds, and the look does not lie.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- looks
- nodes
- skin
- HDR
- stills
- the colour bay
- hard shots
- look references
Sources for this job· O*NET 27-4032.00· ESCO/ISCO 3521
IS WORK OVER?
Port crane operator
18%
#562 / 623
View rankingPort crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stowage, bays and the twistlock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, the wind and the spreader.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shift, the ship that arrives and the one that leaves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, the spreader that will not lock and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The docker below and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not hitting the ship, and leaving the bay clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stowage
- twistlocks
- spreader
- bays
- lift boxes
- quay wind
- terminal shifts
- cover nobody
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343