IS WORK OVER?

Automation index

How much of a Colourist’s job can AI already do?

A look comes earlier. Skin that holds without eating the set do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Colourist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Look, stills and the reference.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Session, nodes and the hard shot.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Skin, sky and not eating the set.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Delivery, HDR and the one that misses in the theatre.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The director, the ego and not loading the orange.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Skin holds, and the look does not lie.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • looks
  • nodes
  • skin
  • HDR
  • stills
  • the colour bay
  • hard shots
  • look references

Sources for this job· O*NET 27-4032.00· ESCO/ISCO 3521

Telecom engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Size, simulate and plan radio and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Projects, permits and sites.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Field, measurements and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incidents, NOC and operators.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, spectrum and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a town dark from a mistake.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Size, simulate and plan radio and fibre
  • Projects, permits and sites
  • Field, measurements and commissioning
  • Incidents, NOC and operators
  • Rules, spectrum and documentation
  • Not leaving a town dark from a mistake
  • ingeniero de telecomunicaciones
  • telecom engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153

Analyse my job

Jobs with similar scores

  1. 138Category manager27%
  2. 139Research scientist27%
  3. 140Climatologist27%
  4. 142Export salesperson27%
  5. 143Inside sales27%
  6. 144Truck driver27%