IS WORK OVER?

Automation index

How much of a Comic artist’s job can AI already do?

A paged script comes earlier. A panel that reads without the deadline eating the line do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Comic artist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paging, panels and the rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pencil, ink and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Colour, lettering and the balloon that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Delivery, the editor and the page change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The serial, the fatigue and not recycling the same face.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it reads, and not eating the line.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • panels
  • paging
  • ink
  • lettering
  • balloons
  • serials
  • pencil
  • page deadline

Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 148Inside sales27%
  2. 149Truck driver27%
  3. 150Franchise consultant27%
  4. 152Headteacher27%
  5. 153Hotel manager27%
  6. 154Spa manager27%