Automation index
How much of a Comic artist’s job can AI already do?
A paged script comes earlier. A panel that reads without the deadline eating the line do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Comic artist
27%
AI can already do 27% of this job.
#151 / 753
View rankingComic artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paging, panels and the rhythm.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Pencil, ink and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Colour, lettering and the balloon that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Delivery, the editor and the page change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The serial, the fatigue and not recycling the same face.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it reads, and not eating the line.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- panels
- paging
- ink
- lettering
- balloons
- serials
- pencil
- page deadline
Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166
IS WORK OVER?
HVAC engineer
27%
#173 / 753
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149