IS WORK OVER?

Automation index

How much of a Comic artist’s job can AI already do?

A paged script comes earlier. A panel that reads without the deadline eating the line do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Comic artist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paging, panels and the rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pencil, ink and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Colour, lettering and the balloon that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Delivery, the editor and the page change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The serial, the fatigue and not recycling the same face.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it reads, and not eating the line.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • panels
  • paging
  • ink
  • lettering
  • balloons
  • serials
  • pencil
  • page deadline

Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 143Inside sales27%
  2. 144Truck driver27%
  3. 145Franchise consultant27%
  4. 147Hotel manager27%
  5. 148Spa manager27%
  6. 149Sporting director27%