Automation index
How much of a Comic artist’s job can AI already do?
A paged script comes earlier. A panel that reads without the deadline eating the line do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Comic artist
27%
AI can already do 27% of this job.
#146 / 623
View rankingComic artist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Paging, panels and the rhythm.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Pencil, ink and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Colour, lettering and the balloon that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Delivery, the editor and the page change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The serial, the fatigue and not recycling the same face.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it reads, and not eating the line.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- panels
- paging
- ink
- lettering
- balloons
- serials
- pencil
- page deadline
Sources for this job· O*NET 27-1013.00· ESCO/ISCO 2166
IS WORK OVER?
Prompt engineer
34%
#21 / 623
View rankingPrompt engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design prompts, tools and chains.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 58% | +13.9 |
Evals, datasets and regressions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Integrate with product and safety limits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to the business about a good output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Watch hallucinations, bias and cost.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 20% | +2.8 |
Decide what the model gets, and what it does not.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 16% | +1.9 |
| Total | 100% | 34% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design prompts, tools and chains
- Evals, datasets and regressions
- Integrate with product and safety limits
- Talk to the business about a good output
- Watch hallucinations, bias and cost
- prompt engineer
- ingeniero de prompts
- llm engineer
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512