IS WORK OVER?

Automation index

How much of a Commercial diver’s job can AI already do?

A dive plan comes earlier. Working below and coming up whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Commercial diver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, tables and the day’s gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bottom, tool and the one who snags.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Comms, the tender and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Inspection, wet weld or cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Current, zero vis and not losing the buddy.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Come up whole, and not skipping decompression.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive plan
  • decompression tables
  • wet weld
  • tender
  • zero vis
  • underwater cut
  • dive gas
  • the bottom

Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541

Actuary

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run models, reserves and sensitivities.
Estimate

No public source provides a precise figure. This is our estimate.

24%55%+13.2
Draft technical reports and memos.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Choose assumptions, tables and criteria.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Explain to the board and the supervisor.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Validate data quality and bias.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Signed opinion and professional liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%32%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Run models, reserves and sensitivities
  • Draft technical reports and memos
  • Choose assumptions, tables and criteria
  • Explain to the board and the supervisor
  • Validate data quality and bias
  • Signed opinion and professional liability
  • actuario
  • actuary

Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120

Analyse my job

Jobs with similar scores

  1. 562Aerial technician18%
  2. 563Varnisher18%
  3. 564Wildland firefighter18%
  4. 566Camera operator18%
  5. 567Bartender18%
  6. 568Postal worker18%