Automation index
How much of a Commercial diver’s job can AI already do?
A dive plan comes earlier. Working below and coming up whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Commercial diver
18%
AI can already do 18% of this job.
#565 / 643
View rankingCommercial diver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, tables and the day’s gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bottom, tool and the one who snags.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Comms, the tender and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Inspection, wet weld or cut.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Current, zero vis and not losing the buddy.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Come up whole, and not skipping decompression.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dive plan
- decompression tables
- wet weld
- tender
- zero vis
- underwater cut
- dive gas
- the bottom
Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541
IS WORK OVER?
Chemical engineer
25%
#246 / 643
View rankingChemical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Balances, simulation and sizing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
P&IDs, specs and equipment lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Plant, operators and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, HAZOP and discharges.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Quality, standards and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a process that will not explode.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Balances, simulation and sizing
- P&IDs, specs and equipment lists
- Plant, operators and commissioning
- Safety, HAZOP and discharges
- Quality, standards and documentation
- Sign a process that will not explode
- ingeniero quimico
- chemical engineer
Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145