IS WORK OVER?

Automation index

How much of a Commercial diver’s job can AI already do?

A dive plan comes earlier. Working below and coming up whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Commercial diver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, tables and the day’s gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bottom, tool and the one who snags.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Comms, the tender and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Inspection, wet weld or cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Current, zero vis and not losing the buddy.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Come up whole, and not skipping decompression.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive plan
  • decompression tables
  • wet weld
  • tender
  • zero vis
  • underwater cut
  • dive gas
  • the bottom

Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541

Corrosion engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Thicknesses, the map and the coupon.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the pipe and the one that is thin.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cathode, the protection and the one that will not take.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shutdown, the coating and not painting over rust.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the rush and not leaving the thin one in service.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop before it goes, and not painting over it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thicknesses
  • corrosion maps
  • cathodic protection
  • coatings
  • thin pipes
  • shutdowns
  • rust
  • coupons

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 672Aerial technician18%
  2. 673Varnisher18%
  3. 674Wildland firefighter18%
  4. 676Camera operator18%
  5. 677Bartender18%
  6. 678Postal worker18%