IS WORK OVER?

Automation index

How much of a Commercial diver’s job can AI already do?

A dive plan comes earlier. Working below and coming up whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Commercial diver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, tables and the day’s gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bottom, tool and the one who snags.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Comms, the tender and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Inspection, wet weld or cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Current, zero vis and not losing the buddy.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Come up whole, and not skipping decompression.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive plan
  • decompression tables
  • wet weld
  • tender
  • zero vis
  • underwater cut
  • dive gas
  • the bottom

Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 572Aerial technician18%
  2. 573Varnisher18%
  3. 574Wildland firefighter18%
  4. 576Camera operator18%
  5. 577Bartender18%
  6. 578Postal worker18%