IS WORK OVER?

Automation index

How much of a Commercial diver’s job can AI already do?

A dive plan comes earlier. Working below and coming up whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Commercial diver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, tables and the day’s gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bottom, tool and the one who snags.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Comms, the tender and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Inspection, wet weld or cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Current, zero vis and not losing the buddy.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Come up whole, and not skipping decompression.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive plan
  • decompression tables
  • wet weld
  • tender
  • zero vis
  • underwater cut
  • dive gas
  • the bottom

Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 562Aerial technician18%
  2. 563Varnisher18%
  3. 564Wildland firefighter18%
  4. 566Camera operator18%
  5. 567Bartender18%
  6. 568Postal worker18%