IS WORK OVER?

Automation index

How much of a Commercial diver’s job can AI already do?

A dive plan comes earlier. Working below and coming up whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Commercial diver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, tables and the day’s gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bottom, tool and the one who snags.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Comms, the tender and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Inspection, wet weld or cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Current, zero vis and not losing the buddy.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Come up whole, and not skipping decompression.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive plan
  • decompression tables
  • wet weld
  • tender
  • zero vis
  • underwater cut
  • dive gas
  • the bottom

Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541

Power-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-point, parameters and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Room, alarms and the one that trips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Start, stop and not skipping the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, isolation and the permit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the grid and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The set-point, and not tripping.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • set-points
  • control room
  • plant SOP
  • starts
  • isolations
  • alarms
  • dispatch
  • the grid

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 552Aerial technician18%
  2. 553Varnisher18%
  3. 554Wildland firefighter18%
  4. 556Camera operator18%
  5. 557Bartender18%
  6. 558Postal worker18%