Automation index
How much of a Commercial registrar’s job can AI already do?
An entry and a tax-ID check come earlier. Qualifying a company formation and owning the folio do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Commercial registrar
29%
AI can already do 29% of this job.
#69 / 623
View rankingCommercial registrar
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Review deeds, accounts and appointments.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Entries, notes and the official gazette.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Annual accounts, filings and the registry freeze.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Presenter, notary and the qualification doubt.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Appeals, reports and the directorate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The commercial folio and the faith of the register.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- qualify deeds
- commercial entries
- annual accounts
- official gazette
- appointments
- registry freeze
- commercial notes
- companies directorate
Sources for this job· O*NET 23-2093.00· ESCO/ISCO 2619
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142