How much of a Commissioning engineer’s job can AI already do?

A test protocol comes earlier. Starting up without leaving an interlock jumped do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Commissioning engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, the loop and the punch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, start-up and the one that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Test, the trip and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vendors, the one who does not come and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Start up, and not leaving the interlock jumped.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test protocols
  • loops
  • punch list
  • start-up
  • trips
  • vendors
  • interlocks
  • not sign half done

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 384Mechatronics engineer22%
  2. 385Mining engineer22%
  3. 386Bridge engineer22%
  4. 388Safety engineer22%
  5. 389Railway engineer22%
  6. 390Forestry engineer22%