Automation index
How much of a Commissioning engineer’s job can AI already do?
A test protocol comes earlier. Starting up without leaving an interlock jumped do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Commissioning engineer
22%
AI can already do 22% of this job.
#396 / 753
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
CAD designer
27%
#204 / 753
View rankingCAD designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimensions and the drawing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clash, the hit and not leaving it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
List, the material and the one that does not exist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the revision and not losing the native.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shop, the doubt and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be made, and not leaving the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- 3D models
- dimensions
- clashes
- bills of materials
- revisions
- shop drawings
- natives
- hits
Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118