Automation index
How much of a Commissioning engineer’s job can AI already do?
A test protocol comes earlier. Starting up without leaving an interlock jumped do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Commissioning engineer
22%
AI can already do 22% of this job.
#396 / 753
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165