How much of a Commissioning engineer’s job can AI already do?
A test protocol comes earlier. Starting up without leaving an interlock jumped do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Commissioning engineer
22%
AI can already do 22% of this job.
#392 / 743
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142