How much of a Commissioning engineer’s job can AI already do?

A test protocol comes earlier. Starting up without leaving an interlock jumped do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Commissioning engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, the loop and the punch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, start-up and the one that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Test, the trip and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vendors, the one who does not come and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Start up, and not leaving the interlock jumped.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test protocols
  • loops
  • punch list
  • start-up
  • trips
  • vendors
  • interlocks
  • not sign half done

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Welding engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, the coupon and the qualification.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shop, the bead and the one who skips the procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the fail and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the position and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the rush and not signing the extra overlap.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the bead holds, and not signing the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • coupons
  • welder qualification
  • beads
  • NDT
  • positions
  • overlaps
  • welding procedures

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 389Mechatronics engineer22%
  2. 390Mining engineer22%
  3. 391Bridge engineer22%
  4. 393Safety engineer22%
  5. 394Welding engineer22%
  6. 395Power engineer22%