Automation index
How much of a Composer’s job can AI already do?
A mock-up and a part come earlier. Something that sounds and can be played does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Composer
21%
AI can already do 21% of this job.
#490 / 733
View rankingComposer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Mock-ups, parts and a first arrangement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Write, orchestrate and review with players.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Director, producer and opening deadlines.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rights, publishers and versions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Studio, libraries and delivery.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not delivering a score that cannot be played.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Mock-ups, parts and a first arrangement
- Write, orchestrate and review with players
- Director, producer and opening deadlines
- Rights, publishers and versions
- Studio, libraries and delivery
- compositor
- composer
Sources for this job· O*NET 27-2041.00· ESCO/ISCO 2652
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142