IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Army officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, the map and the section.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the one who lags and the one who jumps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Live fire, safety and not playing brave.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logistics, the meal and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Command, the pressure and not dressing casualties.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Get them all out, and not losing one.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • operations orders
  • sections
  • the map
  • live fire
  • meals
  • casualties
  • command
  • field safety

Sources for this job· O*NET 55-1015.00· ESCO/ISCO 0110

Analyse my job

Jobs with similar scores

  1. 596Power-plant operator19%
  2. 597Demolition worker19%
  3. 598Wastewater-plant operator19%
  4. 600Piling operator19%
  5. 601Recycling-plant operator19%
  6. 602Organ builder19%