IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 517Power-plant operator19%
  2. 518Demolition worker19%
  3. 519Wastewater-plant operator19%
  4. 521Piling operator19%
  5. 522Recycling-plant operator19%
  6. 523Organ builder19%