IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Commercial diver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, tables and the day’s gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bottom, tool and the one who snags.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Comms, the tender and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Inspection, wet weld or cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Current, zero vis and not losing the buddy.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Come up whole, and not skipping decompression.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive plan
  • decompression tables
  • wet weld
  • tender
  • zero vis
  • underwater cut
  • dive gas
  • the bottom

Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541

Analyse my job

Jobs with similar scores

  1. 527Power-plant operator19%
  2. 528Demolition worker19%
  3. 529Wastewater-plant operator19%
  4. 531Piling operator19%
  5. 532Recycling-plant operator19%
  6. 533Organ builder19%