IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Headteacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Timetable, quotas and the staff.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Family, the complaint and the one that reaches inspection.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Behaviour, the sanction and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Budget, the club and not leaving a hole.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspection, the figure and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That Monday holds, and not hiding the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • school timetables
  • quotas
  • behaviour
  • sanctions
  • school budget
  • inspection
  • family complaints
  • senior staff

Sources for this job· O*NET 11-9032.00· ESCO/ISCO 1345

Analyse my job

Jobs with similar scores

  1. 560Power-plant operator19%
  2. 561Demolition worker19%
  3. 562Wastewater-plant operator19%
  4. 564Piling operator19%
  5. 565Recycling-plant operator19%
  6. 566Organ builder19%