IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Histology technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Intake, the pot and not mixing cases.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Process, embed and the block.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cut, the knife and the one that falls apart.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Stain, the control and the one that will not take.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The pathologist, the rush and not sending a bad cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not losing the diagnosis on the knife.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • paraffin blocks
  • histology cutting
  • stains
  • tissue processor
  • not mix cases
  • microtome knife
  • stain controls
  • embedding

Sources for this job· O*NET 29-2012.00· ESCO/ISCO 3212

Analyse my job

Jobs with similar scores

  1. 541Power-plant operator19%
  2. 542Demolition worker19%
  3. 543Wastewater-plant operator19%
  4. 545Piling operator19%
  5. 546Recycling-plant operator19%
  6. 547Organ builder19%