IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

IVF laboratory technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diary, the retrieval and the count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Capacitation, the sample and the one that is not there.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Identify, the double check and not crossing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cryopreserve, the tank and the one that is lost.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The embryologist, the rush and not rushing a tube.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not crossing couples. Ever.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • retrievals
  • sperm capacitation
  • double check
  • cryopreservation
  • nitrogen tanks
  • identify gametes
  • not cross couples
  • oocyte count

Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212

Analyse my job

Jobs with similar scores

  1. 541Power-plant operator19%
  2. 542Demolition worker19%
  3. 543Wastewater-plant operator19%
  4. 545Piling operator19%
  5. 546Recycling-plant operator19%
  6. 547Organ builder19%