IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Palaeontologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Site, grid and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, consolidate and the one that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Lab, prep and the mould.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the works and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Theft, the permit and not hiding the piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it out whole, and not breaking it.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • sites
  • grids
  • consolidate fossils
  • prep
  • moulds
  • dig logs
  • permits
  • works on site

Sources for this job· O*NET 19-3091.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 517Power-plant operator19%
  2. 518Demolition worker19%
  3. 519Wastewater-plant operator19%
  4. 521Piling operator19%
  5. 522Recycling-plant operator19%
  6. 523Organ builder19%