Automation index
How much of a Concrete finisher’s job can AI already do?
A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Concrete finisher
19%
AI can already do 19% of this job.
#627 / 753
View rankingConcrete finisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, joints and thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pour, vibrate and float.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Screed, power float and the right moment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cure, polythene and the windy day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late mixer and the one who wants water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack open, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pour concrete
- vibrate
- float
- shrinkage joints
- power float
- cure
- screed
- slab thickness
Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114
IS WORK OVER?
PLC programmer
22%
#453 / 753
View rankingPLC programmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Ladder, tags and the comment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cell, the fault and the one that will not stop.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
E-stop, the cable and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Recipe, the change and not dumping production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The electrician, the terminals and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it stops on a fault, and not jumping the e-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- tags
- e-stops
- faults
- recipes
- terminals
- program comments
- not jump e-stops
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514