IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Process engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
P&IDs, balances and the operating procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Plant, trials and the real bottleneck.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Capacity, yields and the improvement report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Start-up, shutdown and the shift that skips the SOP.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Process safety and the HAZOP that hurts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not overloading the reactor, and signing the change.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • P&IDs
  • mass balances
  • HAZOP
  • plant start-up
  • improve yields
  • SOP
  • bottlenecks
  • process safety

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 517Power-plant operator19%
  2. 518Demolition worker19%
  3. 519Wastewater-plant operator19%
  4. 521Piling operator19%
  5. 522Recycling-plant operator19%
  6. 523Organ builder19%