IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Rebar worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cutting list, diameters and steel order.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, bend and tie rebar.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Slabs, columns and starter bars.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, kilos and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving cover too short.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Cutting list, diameters and steel order
  • Cut, bend and tie rebar
  • Slabs, columns and starter bars
  • Site, crane and safety
  • Logs, kilos and extras
  • Not leaving cover too short
  • ferrallista
  • armador de hierro
  • rebar

Sources for this job· O*NET 47-2171.00· ESCO/ISCO 7214

Analyse my job

Jobs with similar scores

  1. 527Power-plant operator19%
  2. 528Demolition worker19%
  3. 529Wastewater-plant operator19%
  4. 531Piling operator19%
  5. 532Recycling-plant operator19%
  6. 533Organ builder19%