IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Schools inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Visit, the rubric and the timetable.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Classroom, what happens and not the slide deck.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Report, the school and not softening it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Appeal, the union and not yielding the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The minister, the pressure and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Say what is there, and not what they want to hear.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • inspection visits
  • rubrics
  • school reports
  • real classrooms
  • appeals
  • not soften
  • the department
  • school evaluation

Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422

Analyse my job

Jobs with similar scores

  1. 570Power-plant operator19%
  2. 571Demolition worker19%
  3. 572Wastewater-plant operator19%
  4. 574Piling operator19%
  5. 575Recycling-plant operator19%
  6. 576Organ builder19%