IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Ship agent

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ETA, berth and port services.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Clearance, crew and the crew change.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
The master, the terminal and the window clash.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Invoices, disbursements and the owner’s account.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The inspection, the delay and not losing the slot.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No extra demurrage, and the ship cleared.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ETAs
  • berths
  • ship clearance
  • crew changes
  • disbursements
  • terminal windows
  • owner’s accounts
  • port inspections

Sources for this job· O*NET 43-5011.00· ESCO/ISCO 3331

Analyse my job

Jobs with similar scores

  1. 517Power-plant operator19%
  2. 518Demolition worker19%
  3. 519Wastewater-plant operator19%
  4. 521Piling operator19%
  5. 522Recycling-plant operator19%
  6. 523Organ builder19%