IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Shipbuilder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Block, alignment and the yard.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bead, NDT and the one that failed.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Launch, the weight and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Sea trial, the vibration and the one that knocks.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the rush and not leaving the bead half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it floats true, and not leaving the bead.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • yard blocks
  • alignment
  • ship beads
  • launch
  • sea trials
  • marine NDT
  • owners
  • vibrations

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 624Power-plant operator19%
  2. 625Demolition worker19%
  3. 626Wastewater-plant operator19%
  4. 628Piling operator19%
  5. 629Recycling-plant operator19%
  6. 630Organ builder19%