IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Tailor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Pattern, measures and the fitting.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Cut, tack and the shoulder that will not hang.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fit, mark and the client who loses weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Buttonholes, lining and the hand finish.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The groom, the deadline and not rushing the hem.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Hang on the body, and not leaving a high shoulder.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • take measures
  • patterns
  • tack
  • buttonholes
  • tailor fittings
  • linings
  • hem
  • shoulder

Sources for this job· O*NET 51-6052.00· ESCO/ISCO 7531

Analyse my job

Jobs with similar scores

  1. 527Power-plant operator19%
  2. 528Demolition worker19%
  3. 529Wastewater-plant operator19%
  4. 531Piling operator19%
  5. 532Recycling-plant operator19%
  6. 533Organ builder19%