IS WORK OVER?

Automation index

How much of a Concrete finisher’s job can AI already do?

A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Tax lawyer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assessment, the file and the appeal.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Inspection, the minute and not lying about the fact.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
TEAR, the hearing and the precedent.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Constitutional, the one that will not fly and not selling it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not building a dodge.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Fight it, and not signing what will not be swallowed.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tax appeals
  • assessments
  • inspection minutes
  • TEAR
  • precedents
  • tax dodges
  • the tax office
  • facts

Sources for this job· O*NET 23-1011.00· ESCO/ISCO 2611

Analyse my job

Jobs with similar scores

  1. 586Power-plant operator19%
  2. 587Demolition worker19%
  3. 588Wastewater-plant operator19%
  4. 590Piling operator19%
  5. 591Recycling-plant operator19%
  6. 592Organ builder19%