Automation index
How much of a Concrete finisher’s job can AI already do?
A joint set-out comes earlier. Finishing on time so the slab does not crack open do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Concrete finisher
19%
AI can already do 19% of this job.
#530 / 643
View rankingConcrete finisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, joints and thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pour, vibrate and float.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Screed, power float and the right moment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cure, polythene and the windy day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late mixer and the one who wants water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack open, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pour concrete
- vibrate
- float
- shrinkage joints
- power float
- cure
- screed
- slab thickness
Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114
IS WORK OVER?
Tiler
17%
#608 / 643
View rankingTiler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Layout, levels and ordering tile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Cut, set and grout.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Substrates, falls and awkward points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, client and not staining the house.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Quantities, extras and logs.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a floor that sounds hollow.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Layout, levels and ordering tile
- Cut, set and grout
- Substrates, falls and awkward points
- Site, client and not staining the house
- Quantities, extras and logs
- Not leaving a floor that sounds hollow
- solador
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122