IS WORK OVER?

Automation index

Can AI do the work of a Construction laborer?

Today an AI or a robot can barely cover part of a shift. Pace, the physical space, and dealing with people still are the job.

It is not a forecast of job losses either.

Task comparison

Construction laborer

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
Estimate

No public source pins this saving. It is an estimate of the method.

12%28%+3.4
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
Estimate

No public source pins this saving. It is an estimate of the method.

10%28%+2.8
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
Estimate

No public source pins this saving. It is an estimate of the method.

10%28%+2.8
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
Estimate

No public source pins this saving. It is an estimate of the method.

10%28%+2.8
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
Estimate

No public source pins this saving. It is an estimate of the method.

9%28%+2.5
Lubricate, clean, or repair machinery, equipment, or tools.
Estimate

No public source pins this saving. It is an estimate of the method.

8%12%+1
Measure, mark, or record openings or distances to layout areas where construction work will be performed.
Estimate

No public source pins this saving. It is an estimate of the method.

8%55%+4.4
Read plans, instructions, or specifications to determine work activities.
Estimate

No public source pins this saving. It is an estimate of the method.

7%28%+2
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source pins this saving. It is an estimate of the method.

26%28%+7.3
Total100%29%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • install wood elements in structures
  • apply finish to concrete
  • inspect masonry work
  • check compatibility of materials
  • dig soil mechanically
  • pour concrete
  • transport construction supplies
  • operate digging construction equipment
  • work in a construction team
  • inspect construction supplies

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313

Auditor

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Supervise auditing of establishments, and determine scope of investigation required.
Estimate

No public source pins this saving. It is an estimate of the method.

12%22%+2.6
Analyze business operations, trends, costs, revenues, financial commitments, and obligations to project future revenues and expenses or to provide advice.
Estimate

No public source pins this saving. It is an estimate of the method.

9%48%+4.3
Develop, implement, modify, and document recordkeeping and accounting systems, making use of current computer technology.
Estimate

No public source pins this saving. It is an estimate of the method.

8%55%+4.4
Report to management regarding the finances of establishment.
Estimate

No public source pins this saving. It is an estimate of the method.

7%55%+3.9
Inspect account books and accounting systems for efficiency, effectiveness, and use of accepted accounting procedures to record transactions.
Estimate

No public source pins this saving. It is an estimate of the method.

7%55%+3.9
Prepare adjusting journal entries.
Estimate

No public source pins this saving. It is an estimate of the method.

7%28%+2
Review accounts for discrepancies and reconcile differences.
Estimate

No public source pins this saving. It is an estimate of the method.

6%28%+1.7
Establish tables of accounts and assign entries to proper accounts.
Estimate

No public source pins this saving. It is an estimate of the method.

6%28%+1.7
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source pins this saving. It is an estimate of the method.

38%28%+10.6
Total100%35%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • ledger entries
  • close accounts
  • reconcile banks
  • accounting department processes
  • financial department processes
  • economics
  • corporate law
  • accounting
  • inspect tax returns
  • control financial resources

Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411

Analyse my job

Nearby in the ranking

  1. 42Hotel receptionist30%
  2. 43IT support30%
  3. 44Community manager29%
  4. 46PR specialist29%
  5. 47Social worker29%
  6. 48Database administrator28%