IS WORK OVER?

Automation index

How much of a Construction laborer’s job can AI already do?

Today an AI or a robot can barely cover part of a shift. Pace, the physical space, and dealing with people still are the job.

This percentage does not predict how many people will lose their jobs.

Task comparison

Construction laborer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
Estimate

No public source provides a precise figure. This is our estimate.

12%28%+3.4
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
Estimate

No public source provides a precise figure. This is our estimate.

10%28%+2.8
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
Estimate

No public source provides a precise figure. This is our estimate.

10%28%+2.8
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
Estimate

No public source provides a precise figure. This is our estimate.

10%28%+2.8
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
Estimate

No public source provides a precise figure. This is our estimate.

9%28%+2.5
Lubricate, clean, or repair machinery, equipment, or tools.
Estimate

No public source provides a precise figure. This is our estimate.

8%12%+1
Measure, mark, or record openings or distances to layout areas where construction work will be performed.
Estimate

No public source provides a precise figure. This is our estimate.

8%55%+4.4
Read plans, instructions, or specifications to determine work activities.
Estimate

No public source provides a precise figure. This is our estimate.

7%28%+2
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source provides a precise figure. This is our estimate.

26%28%+7.3
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • install wood elements in structures
  • apply finish to concrete
  • inspect masonry work
  • check compatibility of materials
  • dig soil mechanically
  • pour concrete
  • transport construction supplies
  • operate digging construction equipment
  • work in a construction team
  • inspect construction supplies

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313

Auditor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Supervise auditing of establishments, and determine scope of investigation required.
Estimate

No public source provides a precise figure. This is our estimate.

12%22%+2.6
Analyze business operations, trends, costs, revenues, financial commitments, and obligations to project future revenues and expenses or to provide advice.
Estimate

No public source provides a precise figure. This is our estimate.

9%48%+4.3
Develop, implement, modify, and document recordkeeping and accounting systems, making use of current computer technology.
Estimate

No public source provides a precise figure. This is our estimate.

8%55%+4.4
Report to management regarding the finances of establishment.
Estimate

No public source provides a precise figure. This is our estimate.

7%55%+3.9
Inspect account books and accounting systems for efficiency, effectiveness, and use of accepted accounting procedures to record transactions.
Estimate

No public source provides a precise figure. This is our estimate.

7%55%+3.9
Prepare adjusting journal entries.
Estimate

No public source provides a precise figure. This is our estimate.

7%28%+2
Review accounts for discrepancies and reconcile differences.
Estimate

No public source provides a precise figure. This is our estimate.

6%28%+1.7
Establish tables of accounts and assign entries to proper accounts.
Estimate

No public source provides a precise figure. This is our estimate.

6%28%+1.7
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source provides a precise figure. This is our estimate.

38%28%+10.6
Total100%35%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ledger entries
  • close accounts
  • reconcile banks
  • accounting department processes
  • financial department processes
  • economics
  • corporate law
  • accounting
  • inspect tax returns
  • control financial resources

Sources for this job· O*NET 13-2011.00· ESCO/ISCO 2411

Analyse my job

Jobs with similar scores

  1. 64ML engineer29%
  2. 65Occupational physician29%
  3. 66Career counsellor29%
  4. 68Insurance claims adjuster29%
  5. 69Commercial registrar29%
  6. 70PR specialist29%