IS WORK OVER?

Automation index

Can AI do the work of a Construction laborer?

Today an AI or a robot can barely cover part of a shift. Pace, the physical space, and dealing with people still are the job.

It is not a forecast of job losses either.

Task comparison

Construction laborer

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
Estimate

No public source pins this saving. It is an estimate of the method.

12%28%+3.4
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
Estimate

No public source pins this saving. It is an estimate of the method.

10%28%+2.8
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
Estimate

No public source pins this saving. It is an estimate of the method.

10%28%+2.8
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
Estimate

No public source pins this saving. It is an estimate of the method.

10%28%+2.8
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
Estimate

No public source pins this saving. It is an estimate of the method.

9%28%+2.5
Lubricate, clean, or repair machinery, equipment, or tools.
Estimate

No public source pins this saving. It is an estimate of the method.

8%12%+1
Measure, mark, or record openings or distances to layout areas where construction work will be performed.
Estimate

No public source pins this saving. It is an estimate of the method.

8%55%+4.4
Read plans, instructions, or specifications to determine work activities.
Estimate

No public source pins this saving. It is an estimate of the method.

7%28%+2
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source pins this saving. It is an estimate of the method.

26%28%+7.3
Total100%29%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • install wood elements in structures
  • apply finish to concrete
  • inspect masonry work
  • check compatibility of materials
  • dig soil mechanically
  • pour concrete
  • transport construction supplies
  • operate digging construction equipment
  • work in a construction team
  • inspect construction supplies

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313

Business analyst

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Gather and organize information on problems or procedures.
Estimate

No public source pins this saving. It is an estimate of the method.

23%28%+6.4
Develop and implement records management program for filing, protection, and retrieval of records, and assure compliance with program.
Estimate

No public source pins this saving. It is an estimate of the method.

13%55%+7.2
Confer with personnel concerned to ensure successful functioning of newly implemented systems or procedures.
Estimate

No public source pins this saving. It is an estimate of the method.

13%28%+3.6
Analyze data gathered and develop solutions or alternative methods of proceeding.
Estimate

No public source pins this saving. It is an estimate of the method.

13%48%+6.2
Recommend purchase of storage equipment and design area layout to locate equipment in space available.
Estimate

No public source pins this saving. It is an estimate of the method.

11%28%+3.1
Design, evaluate, recommend, and approve changes of forms and reports.
Estimate

No public source pins this saving. It is an estimate of the method.

7%55%+3.9
Prepare manuals and train workers in use of new forms, reports, procedures or equipment, according to organizational policy.
Estimate

No public source pins this saving. It is an estimate of the method.

5%55%+2.8
Review forms and reports and confer with management and users about format, distribution, and purpose, identifying problems and improvements.
Estimate

No public source pins this saving. It is an estimate of the method.

5%55%+2.8
Other less frequent tasks (weight estimated from frequency).
Estimate

No public source pins this saving. It is an estimate of the method.

10%28%+2.8
Total100%39%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • business analysis
  • risk management
  • market research
  • scientific research methodology
  • perform business analysis
  • identify undetected organisational needs
  • analyse business plans
  • interpret financial statements
  • conduct quantitative research
  • analyse financial performance of a company

Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421

Analyse my job

Nearby in the ranking

  1. 42Hotel receptionist30%
  2. 43IT support30%
  3. 44Community manager29%
  4. 46PR specialist29%
  5. 47Social worker29%
  6. 48Database administrator28%