Automation index
How much of a Construction laborer’s job can AI already do?
Today an AI or a robot can barely cover part of a shift. Pace, the physical space, and dealing with people still are the job.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Construction laborer
29%
AI can already do 29% of this job.
#67 / 753
View rankingConstruction laborer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 28% | +3.4 |
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Lubricate, clean, or repair machinery, equipment, or tools.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 12% | +1 |
Measure, mark, or record openings or distances to layout areas where construction work will be performed.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 55% | +4.4 |
Read plans, instructions, or specifications to determine work activities.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 26% | 28% | +7.3 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wood elements in structures
- apply finish to concrete
- inspect masonry work
- check compatibility of materials
- dig soil mechanically
- pour concrete
- transport construction supplies
- operate digging construction equipment
- work in a construction team
- inspect construction supplies
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313
IS WORK OVER?
District heating engineer
22%
#398 / 753
View rankingDistrict heating engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Balance, flows and the loss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Chamber, the leak and the one that weeps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Substation, the valve and the one that will not open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Winter, the last block and not leaving it cold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the tariff and not hiding the loss.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the heat arrives, and not hiding the loss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- heat balances
- flows
- network losses
- chambers
- heat substations
- the last block
- tariffs
- leaks
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149