Automation index
How much of a Construction laborer’s job can AI already do?
Today an AI or a robot can barely cover part of a shift. Pace, the physical space, and dealing with people still are the job.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Construction laborer
29%
AI can already do 29% of this job.
#67 / 623
View rankingConstruction laborer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 28% | +3.4 |
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Lubricate, clean, or repair machinery, equipment, or tools.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 12% | +1 |
Measure, mark, or record openings or distances to layout areas where construction work will be performed.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 55% | +4.4 |
Read plans, instructions, or specifications to determine work activities.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 26% | 28% | +7.3 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wood elements in structures
- apply finish to concrete
- inspect masonry work
- check compatibility of materials
- dig soil mechanically
- pour concrete
- transport construction supplies
- operate digging construction equipment
- work in a construction team
- inspect construction supplies
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313
IS WORK OVER?
Logistics analyst
28%
#79 / 623
View rankingLogistics analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Costs, OTIF and the dashboard.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Simulate network, warehouses and the what-if.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Ops, dirty data and going down to the dock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the board and the cut that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The haulier, the contract and not breaking the service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
A real saving, and not dressing OTIF.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- logistics costs
- OTIF
- simulate network
- what-if
- dirty data
- haulage contracts
- dashboards
- network cuts
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 2421