Automation index
Can AI do the work of a Construction laborer?
Today an AI or a robot can barely cover part of a shift. Pace, the physical space, and dealing with people still are the job.
It is not a forecast of job losses either.
Task comparison
IS WORK OVER?
Construction laborer
29%
AI or a robot can already do 29% of this job.
#45 / 103
View rankingConstruction laborer
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.EstimateNo public source pins this saving. It is an estimate of the method. | 12% | 28% | +3.4 |
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 28% | +2.5 |
Lubricate, clean, or repair machinery, equipment, or tools.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 12% | +1 |
Measure, mark, or record openings or distances to layout areas where construction work will be performed.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 55% | +4.4 |
Read plans, instructions, or specifications to determine work activities.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 26% | 28% | +7.3 |
| Total | 100% | 29% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- install wood elements in structures
- apply finish to concrete
- inspect masonry work
- check compatibility of materials
- dig soil mechanically
- pour concrete
- transport construction supplies
- operate digging construction equipment
- work in a construction team
- inspect construction supplies
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313
IS WORK OVER?
Video producer
34%
#21 / 103
View rankingVideo producer
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Write and edit news stories from information collected by reporters and other sources.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 55% | +5 |
Research production topics using the internet, video archives, and other informational sources.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 48% | +4.3 |
Plan details such as framing, composition, camera movement, sound, and actor movement for each shot or scene.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 28% | +2.2 |
Communicate to actors the approach, characterization, and movement needed for each scene in such a way that rehearsals and takes are minimized.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Compose and edit scripts or provide screenwriters with story outlines from which scripts can be written.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Cut and edit film or tape to integrate component parts into desired sequences.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Perform management activities, such as budgeting, scheduling, planning, and marketing.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Direct live broadcasts, films and recordings, or non-broadcast programming for public entertainment or education.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 55% | +2.8 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 44% | 28% | +12.3 |
| Total | 100% | 34% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- project management principles
- film production process
- accounting techniques
- audiovisual products
- copyright legislation
- work with motion picture editing team
- manage budgets
- consult with production director
- select scripts
- liaise with financiers
Sources for this job· O*NET 27-2012.00· ESCO/ISCO 2654