IS WORK OVER?

Automation index

How much of a Control engineer’s job can AI already do?

A PID comes earlier. The plant not oscillating without leaving it in manual for ever do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Control engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PID, tune and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the swing and the one that runs away.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Mode, manual and not leaving it for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Alarm, the interlock and not silencing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the recipe and not changing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not swing, and not leaving manual for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PID
  • tune
  • swings
  • manual mode
  • interlocks
  • recipes
  • control models
  • not silence alarms

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 386Ice-cream maker22%
  2. 387Hydrologist22%
  3. 388Agronomist22%
  4. 390Corrosion engineer22%
  5. 391Instrumentation engineer22%
  6. 392Facilities engineer22%