IS WORK OVER?

Automation index

How much of a Control engineer’s job can AI already do?

A PID comes earlier. The plant not oscillating without leaving it in manual for ever do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Control engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PID, tune and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the swing and the one that runs away.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Mode, manual and not leaving it for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Alarm, the interlock and not silencing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the recipe and not changing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not swing, and not leaving manual for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PID
  • tune
  • swings
  • manual mode
  • interlocks
  • recipes
  • control models
  • not silence alarms

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

QA automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Test, the selector and the flake.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pipeline, the green and the one that lies.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Bug, the repro and not closing it blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Data, the environment and not sharing prod.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The developer, the rush and not skipping the one that fails.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Catch the bug, and not painting a lying green.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • automated tests
  • selectors
  • flakes
  • QA pipelines
  • repro
  • environments
  • lying green
  • debug tests

Sources for this job· O*NET 15-1253.00· ESCO/ISCO 2519

Analyse my job

Jobs with similar scores

  1. 404Ice-cream maker22%
  2. 405Hydrologist22%
  3. 406Agronomist22%
  4. 408Corrosion engineer22%
  5. 409Firmware engineer22%
  6. 410Instrumentation engineer22%