IS WORK OVER?

Automation index

How much of a Cost engineer’s job can AI already do?

A budget comes earlier. Calling the real number without selling the reckless bid do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cost engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, rates and the budget.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the variance and the one that was not logged.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Change, the extra and not giving it away.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Close, the dispute and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Management, the bid and not selling the reckless one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The real number, and not the reckless bid.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measures
  • unit rates
  • variances
  • extras
  • disputes
  • reckless bids
  • works budgets
  • closes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 171Food engineer27%
  2. 172Automation engineer27%
  3. 173HVAC engineer27%
  4. 175Energy engineer27%
  5. 176Packaging engineer27%
  6. 177Reliability engineer27%